OwnerTech → Bathroom Remodel → Scope of Work & Bid Request
Owner-side · Bathroom Remodel

Scope of Work & Bid Request

Instructions

Material Responsibility

For each major finish item, confirm who will supply it based on the owner’s instructions. Use the notes column for model, allowance, quantity, or other clarification.

Material / FixtureWho Supplies?Allowance / Notes
Tub or shower base
Vanity, countertop & sink
Faucets, shower valve & trim
Floor tile
Wall / shower tile
Toilet
Shower glass / enclosure
Mirror, hardware & accessories
Exhaust fan
Light fixtures
Important: If an item is Owner Supplied, the contractor should still include any contractor-supplied installation materials in the relevant Materials line item, such as adhesives, thinset, grout, caulk/sealant, fasteners, shims, connectors, tape, and similar incidental materials. Enter $0 only if no additional installation materials are required.

Contractor

Line-item pricing

You can price each line’s Materials and Labor / Subcontractors individually for detailed pricing — or leave the line prices blank and enter one Materials total and one Labor / Subcontractors total per section using the Section total row. Use one method per section, not both.

IncludedItemNotes / allowanceMaterialsLabor / Subcontractors
Demolition & Prep
Demolition & haul-away$$
Dust protection & containment$$
Section total$$
Rough-In
Plumbing rough-in$$
Electrical$$
Exhaust fan$$
Framing / structural changes$$
Section total$$
Waterproofing & Substrate
Backer board & waterproofing$$
Shower pan / base prep$$
Section total$$
Finishes
Floor tile — install$$
Wall / shower tile — install$$
Tub or shower base$$
Shower glass / enclosure$$
Toilet — supply & install$$
Vanity, countertop & sink$$
Faucets, shower valve & trim$$
Paint$$
Trim, hardware, mirror & accessories$$
Section total$$
Permits & Closeout
Permits & inspections$$
Final cleanup, walkthrough & punch list$$
Section total$$
Materials subtotal$0
Labor / Subcontractors subtotal$0
Direct Cost (Materials + Labor/Subcontractors)$0
GC Markup / Fee (optional)
Already in your line prices? Enter $0.
$
Total Bid (Direct Cost + GC Fee)$0

Unforeseen / Hidden Conditions — Separate Estimate

Not included in Total Bid. This is a separate estimate for possible hidden conditions. If discovered, the final cost will be determined and approved through a change order before additional work proceeds.

Schedule & payment

Exclusions & assumptions

Before you return this

Prepared with HQV OwnerTech — owner-side technology for residential projects. Same scope, every bid.